Validation Reports

Hydrogeo have a team of professionals who are vastly experienced in undertaking site inspections and independent validation of remediation works.

Our technical specialists can independently supervise and verify critical stages of site remediation works. This service ensures that the site developer / remediation contractor complies with the objectives of the remediation strategy which forms a key element of land quality planning conditions associated with contaminated land development.

Hydrogeo advise on an open and regular basis with key statutory authorities during all stages of remediation. Proactive liaison is particularly relevant where a remediation project is linked with a planning condition, this can assist with the timely discharge of relevant planning conditions.

On satisfactory completion of remediation works Hydrogeo routinely prepare a remediation works verification report. Our reports provide a thorough and concise record of the remediation process and demonstrate that the site has been remediated in accordance with the remediation strategy for subsequent submission and approval by the relevant regulatory authorities.

Hydrogeo have experience of validation on a range of remediation works activities including but not limited to:

  • Gas and vapour barrier membrane installation
  • Engineered topsoil cover systems
  • Contamination hotspot removal
  • Underground and Above Ground Chemical Storage Tank removal
  • Soil waste management
  • Soil testing to demonstrate suitability for retention and site re-use
  • Environmental permit surrender

Contaminated Land/Development

Groundwater Protection

SuDS and Flood Risk

Water Supply / Ground Source Heating